Case Study

Facility Resource utilization and monitoring

Case Study On Facility Resource Utilization and Monitoring

iASYS proposes an application for efficient activity tracking with a comprehensive online dashboard. It
provides real-time utilization data, eliminating the need for constant managerial follow-ups. The
dashboard displays detailed metrics for different activities and equipment-specific utilization, along with
interfaces for issue and asset management, ensuring accuracy.

Case Study On Facility Resource Utilization and Monitoring Read More »

Agricultural tractor with attachments drives through farm field

Case Study on Automation and Upgradation of Farm Equipment Engine Test Bed

iASYS recommended a global testing system aligned with future industry norms for Indian Farm Equipment Manufacturers. This approach ensured accessibility and flexibility while integrating with their existing setup, maximizing cost-effectiveness. As a result, the company overcame testing challenges, increased efficiency, enhanced safety, and prepared for evolving industry standards.

Case Study on Automation and Upgradation of Farm Equipment Engine Test Bed Read More »

Centralized Design Validation Plan (DVP) and Automation.

The iASYS designed a workflow engine that enables end users to independently create their own customized processes. This system includes a flexible notification feature, providing a comprehensive view of all process stages, which in turn enhances team communication and allocation of responsibilities. This improvement results in faster and more informed decision-making within departments, ultimately leading to an enhanced overall experience for end customers.

Centralized Design Validation Plan (DVP) and Automation. Read More »

Scroll to Top