Centralized Resource Scheduling and Asset Management

Development Validation teams and facility management teams all work in separate silos and interact via e-mail (Asynchronous Communication).

Development Validation teams and facility management teams all work in separate silos and interact via e-mail (Asynchronous Communication) These are intricate systems that necessitate tight collaboration with equipment providers. Due to limited physical testing assets, e­cient resource use is critical to meet testing deadlines, necessitating proactive preventive maintenance schedules and tight communication between the test engineer and the maintenance team.

A collaborative platform is required where all cross functional team can collaborate seamlessly in real time along with all available physical test resources.

To architect the Solution, we have leveraged our domain expertise coupled with BRIX Lab Platform which was specifically designed for Test lab management.

Download Case Study for More Information

    Share the Post:

    Related Posts

    Case Study on Motor Test Bench Upgradation with RLS Functionality

    This case study highlights iASYS's motor test bench upgrade with RLS functionality, enabling efficient EV motor testing. Key enhancements include an EDC Controller for RLS trials, Nidec
    Drive for bi-directional rotation, and automated data analysis, reducing product development time by 20-25% and data processing time by 60%.

    Read More

    Battery Testing

    Ensuring EV battery safety, reliability, and efficiency is challenging due to performance variability, thermal risks, and integration issues with BMS. A comprehensive testing solution is needed for accurate validation and industry compliance.

    Read More
    Scroll to Top