Case Studies

Centralized Design Validation Plan (DVP), Scheduling and Report Management

A collaborative platform is required where all cross functional team can collaborate seamlessly in Realtime along with all available physical test resources.

A collaborative platform is required where all cross functional team can collaborate seamlessly in Realtime along with all available physical test resources. IASYS proposed the BRIX DVP & Report Management solution to bring the transparency in planning, scheduling, and reporting process. The proposed platform also bring close collaboration between cross function teams and physical testing systems.

Download Case Study for More Information

    Share the Post:

    Related Posts

    EV Transmission Testing Rig

    Case Study On Custom Belt Durability Test Rig For Ev Transmission Validation

    This case study showcases how iASYS engineered a Custom Belt Durability Test Rig for electric vehicle (EV) transmission validation. The solution featured a fixed and movable dyno system, multi-directional adjustable idler post, and flexible pulley adaptations to meet diverse OEM needs. With precise torque control, real-time load monitoring, and advanced thermal management, the rig enabled 1000+ hours of reliable testing, reduced vehicle-level testing efforts, and accelerated product development by 20–25%.

    Read More
    Scroll to Top